"Sanctinasium" Complete
Construction is now complete on the beautiful
"Sanctinasium" Family Life Center for Community Wesleyan Church
in Washington, Michigan. Its multi-use space incorporates many
fine features. One is a worship assembly space seating 745 with
recessed stage providing space for speakers and a choir. Or it
can be used as a high school sized gym using the stage for spectator
seating. This same area can be converted into a fellowship hall
seating 560 people at tables.
The other three sides of the family life center include space
for twenty-three classrooms on two levels, a kitchen, parlor,
foyer, and storage. An elevator provides access to both levels.
Part of the design included renovating part of the existing building
into an office suite, adding a carport, expanding the parking
lot, and masterplanning the property for future expansion as well.
UCBN
RETIREMENT ANNOUNCED:
Donald E. Durance, a Senior Designer and Project
Manager for Hull-Stephens and Associates Architects since its
beginning in 1965, has announced his retirement this summer.
You are invited to attend a reception to honor Don on June 15,
2001 from 3:00 p.m. to 6:00 p.m. at 5023 Holland Drive, Swartz
Creek, MI 48473. We hope you can join us to celebrate this milestone
and the valuable contributions Don has made to us as well as the
hundreds of church projects in the Midwest.
UNDERSTANDING THE ARCHITECT'S AND CONTRACTOR'S
RESPONSIBILITY IN CONSTRUCTION
Both architect and contractor have important
responsibility in the construction of a new facility. An understanding
of the various processes will help you select the one that is
right for you. There are several ways to build your church and
equal ways "to be taken" or to face "unwelcome problems" in construction.
Each process has its advantages and disadvantages. To help you
understand these, let's look at each one.
"COMPETITIVE BID/BUILD" PROCESS
This is the most common process. In this scenario
several contractors submit bids for the construction project,
based on plans previously prepared by the architect. The owner
then selects the contractor's bid which best meets their requirements.
The advantage in the "competitive bid/build"
process is the architect is usually selected by the owner to design
the building, prepare detailed drawings and specifications, direct
the bid process, and oversee construction. Architects are trained
to provide structurally safe, comfortable, attractive, functional
buildings, and they generally understand the building codes. They
also understand the construction process and construction costs,
and direct the bidding process for you. They become your representative
to translate your needs onto paper and then see that the project
gets built the way you want it. They will work with you in selecting
contractors to submit bids on the project, then advise you of
irregularities, if any in bids. You need a minimum of three to
four good bids to assure accuracy. Bidding provides fair competition
and gives you assurance that your project will be built for a
fair price, and within a guaranteed timetable. As your representative
the architect should observe construction, noting irregularities
and verifying the contractor's payment requests, and payments
to subcontractors and suppliers. Since he is your representative,
he has no conflicting interest, and will see that you get the
best quality building possible under the terms of the plans and
contract.
Problems associated with the "competitive bid/build"
process are the contractor doesn't always know what the architect
intended, unless the plans and specifications are very clear.
The architect may not understand what the church wanted if they
are not of "like mind and faith", and issues are not clearly communicated.
The architect cannot guarantee the bid results, which can be affected
by the construction and economic climate. Sometimes contractors
take an adversarial role and look only after their own interests.
"DESIGN/BUILD" PROCESS
In this process the owner usually hires the contractor
first, who in turn hires the architect to provide the plans. They
often provide the owner a guaranteed preliminary estimate of construction
cost. They work both during design and throughout construction
to meet that goal.
The "design/build" advantages are that they work
closely with the owner and architect from the beginning, controlling
cost, and jump-starting construction. They may get involved in
problem solving, and set rigid design and construction schedules.
To take advantage of price jumps in materials or labor they sometimes
start construction before plans are totally complete. Other advantages
are "one source of contact" and responsibility, and the possibility
of a guaranteed construction price before plans are ever completed.
Problems associated with "design/build" may include
the contractor tending to manipulate design and quality at the
altar of "cost savings". They can put undue time pressures on
the architect to meet a schedule they select which can force an
architect to rush and not check as thoroughly, risking mistakes
(be it safety or design flaws). Since the contractor usually is
the lead party to the contract, they sometimes make decisions,
which rightly belong to the architect or owner. But the most serious
problem is that the contract is usually written before design
takes place and without competitive construction bids. There is
no guarantee to the owner that their price will be less than a
"competitive bid" based on a complete set of plans and specifications.
Because of "conflict of interest" the architect may not be able
to insist on top quality construction or design improvements.
"CONSTRUCTION MANAGEMENT" PROCESS
The owner hires a person or company to "manage"
construction. They arrange for and oversee the subcontractors
who build the building. They may be hired during the design process
or after the architect prepares the plans.
The "construction management" advantages are
that they usually have less expensive fees. It is easier for the
owner to provide volunteer labor to keep construction costs down.
The owner usually gives the construction manager free reign to
make any possible cost cutting measures. In this setting the owner
and construction manager become more of a team.
The problems associated with "Construction Management"
are usually related to quality and/or cost. Many times the construction
manager ignores parts of the plans and specifications previously
determined jointly by the architect and owner. This they do to
cut construction cost and sometimes even "undermine the architect's
integrity." They may even bypass the architect's responsibility
to observe construction, and payment request approvals. Therefore
quality can be sacrificed without the owner even knowing it. The
most serious problem is usually when the construction manager
"negotiates" a construction contract thereby avoiding the competitive
bidding process. So the owner doesn't know if he is getting the
lowest price or the most for his dollar. The costs may greatly
exceed the architect's estimate as well as normal construction
industry costs. Another issue to consider is the owner usually
takes all the risk. The construction manager only ""manages" the
subcontractors. The owner pays the subcontractors and suppliers,
and if anything goes wrong after construction it is usually the
owner's responsibility to notify the subs and or suppliers to
enforce the warrantees, if there are any.
"OWNER BUILD" PROCESS
As the title suggests, the owner constructs part
or the entire project. The balance of the project is subcontracted
and managed by the owner. They need a qualified foreman to oversee
all construction activity.
The advantages of "owner builder" are that most labor, management,
and overhead and profit costs are basically eliminated. It gives
the church more ownership and pride in the building because "we
built it ourselves". If done right, this can create a unifying
spirit as the church "works together."
Problems associated with "owner build" are many. If the pastor
manages the project, his ministry and his health will usually
suffer. Church members can become unhappy if things go wrong or
not to their liking. It is hard to insist on top quality from
"volunteer labor". Volunteers can become tired and overworked.
They may have other jobs and homes to maintain as well. When the
help isn't there at the proper times construction can string out
over weeks and even months. This can result in "higher prices"
on some items because of price increases. The delays can also
be disheartening to a congregation.
SUMMARY/CONCLUSION
There are many qualified architects and contractors in each of
the forms noted above. It is in the churches' best interest to
consider several contractors and verify each of their qualifications,
experience, and some of the projects they have built. Many churches
have undergone successful construction projects with each. But
there are also horror stories connected with each type. The purpose
of this article has been to make you aware of the advantages and
disadvantages so that you can prayerfully and intelligently make
the decision best for your church.
As good stewards of God's money, the church leadership should
become familiar with the responsibilities of the contractor and
the architect before entering a contract with any firm or individual.
Churches don't have to suffer because of these problems if they
will just understand construction processes and risks, and watch
for these pitfalls. A church needs to do several things: (1) Pre-qualify
the professionals you deal with. (2) Check for experience and
quality, and how well they worked with previous churches. (Don't
just take someone's word for it.) (3) Determine what is most important
to the church - is it lowest cost, top quality, durability, energy
efficiency, experience, excellent design, or minimal involvement
from church people.
A church building committee chairman once said, "We don't want
to build the church physically, we want to continue to build it
spiritually and numerically." Someone else has said, "it is not
always wise to buy the least expensive, because you probably will
pay more in the end." Hire an experienced "like minded" architect
with lots of church design experience, let him guide you, and
you usually won't be disappointed. UCBN
ON THE BOARDS
Calvary Baptist Church - Findlay, MI
Community Church of God - Clio, MI
First Baptist Church - New Market, IN
Genesee Road Church of God - Flint, MI
First United Methodist Church - Durand, MI
Hadley Community Church - Hadley, MI
Lakeside Missionary Baptist Church - Newport, MI
Shiloh Baptist Church - Pontiac, MI
St. Paul's Lutheran Church - Imlay City, MI
Webberville United Methodist Church - Webberville, MI
Q. We have never built, but are in need of
something. Since I don't know where to begin, can you give me some
guidance?
A. Survey the congregation or leadership and establish a
needs/wants list. Determine potential or desired financial limits.
(We have a list of church financial companies available upon request.)
Establish a priority list. Then select a qualified architect that
has experience and understanding in church design to guide you.
(We also conduct workshops to help determine the needs and desires
of the congregation.)
Please contact us if you have a question you would
like to see addressed in a future article, or need immediate answers.
Stop by and visit our exhibit (#55) at the General
Assembly of the Church of the Nazarene in Indianapolis, Indiana
June 20 - 26, 2001.
|