Fall 2000 Issue No. 13

CHURCH
BUILDING
NOTES

"A newsletter on designing and maintaining your church"


NEED A FACELIFT?

You say you don't need a new facility but your building sure could use a facelift. We can help you with renovating that will give it the spark it needs. Your building may become a more pleasant place to worship and/or teach.

Renovating can make your building barrier free. How about those restrooms - are they too small? Are they barrier free? Do you need more insulation or better windows?

Renovating can make some spaces more usable. Small spaces may need to be enlarged, or large spaces become multi-use areas. Some spaces may need to be adapted to new equipment and technology. Acoustics and lighting can be upgraded to enhance the sanctuary. Let us help you give your building the facelift it needs.UCBN

UNDER CONSTRUCTION:

Congratulations to the following churches. Their plans have been completed and their facility is under construction.

Community Wesleyan Church - Washington, MI
Oakwood Bible Church - Kalamazoo, MI
North Broadway Church of Christ - Mt. Clemons, MI


Call our office and let us help you make your vision become a reality.


WETLANDS AND FLOODPLAINS

Noah was told to prepare for the flood by building an ark and collecting two of every species of life. Our responsibilities for the floodplains and wetlands of our environment don't quite approach the biblical proportions of the story of Noah. They are nevertheless a heavy responsibility that should not be taken lightly.

If your church property is unfortunate enough to be in or near a floodplain, then read on for a primer on how to start to deal with the possibilities of flooding. If you are in a wetland area then feel privileged to be a steward of God's little creatures. Pursue your responsibilities with caution and enthusiasm.

WHAT ARE FLOODPLAINS AND WETLANDS?

First, let's be sure we know the difference between a floodplain and a wetland. Floodplains are areas adjacent to rivers, streams, or other bodies of water that are normally dry but will occasionally flood. This can occur from overflow of inland or tidal waters, or the unusual and rapid accumulation or runoff of surface waters. A rapid spring thaw or an unusually heavy rainfall is a good example. Wetlands are areas that are more permanently influenced by surface or ground water. They are characterized by the presence of wetland vegetation or aquatic life, such as bogs, swamps, and marshes.

Although floodplains and wetlands are distinctly independent topics of concern it is not at all uncommon for them to encompass the same physical area.

WHY DO WE CONTROL DEVELOPMENT IN FLOODPLAINS AND WETLANDS?

The purposes for controlling activities in these areas are quite different. Flooding can cause considerable damage to a building built in the flooded area.

  • Reasons to prevent building in the floodplain include:
    · To protect human life and health.
    · To minimize expenditure of public money for costly flood control projects.
    · To minimize the need for rescue and relief efforts generally undertaken at the expense of the general public.
    · To minimize damage to public facilities and utilities such as, water and gas mains, electric, telephone and sewer lines, streets and bridges.
    · To help maintain a stable tax base by minimizing future flood blight areas.
    · To ensure that potential buyers are notified that property is in an area of special flood hazard.
    · To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions.

  • Wetlands require protection because:
    · They provide places for breeding, nesting and rearing of young wildlife, species of birds, mammals, fish, and reptiles.
    · They provide wildlife for hiking, bird watching, hunting, and fishing. These recreational activities contribute to the state's economy.
    · They provide important natural areas for flood control by intercepting and holding flood or storm waters, slowly dissipating these surplus waters over a period of time.
    · Wetland plants utilize or retain excess nutrients or chemical compounds, such as nitrogen or calcium chloride. These nutrients come from human practices such as fertilizing, burning, and the application of road salt in the winter. Without wetlands, these nutrients find their way into our lakes and streams, contributing to unwanted plant and algae growth.

HOW DO I KNOW IF I AM IN A WETLAND OR FLOODPLAIN?

If evidence of water is at or near the surface, and wetland vegetation is prevalent then you are likely to be in a wetland area. If you are in a low-lying area near a drainage system (river, stream, lake, etc.), you are probably in a floodplain area. At any rate you should always check with your local building department before construction begins. They will be able to help you identify areas of concern.

I'M IN A FLOODPLAIN AND A WETLAND. NOW WHAT?

To address this question we need more definitions on floodplain terminology:

· The 100-year floodplain is based on the flood having a 1% chance of being equaled or exceeded in any given year. In other words, we are likely to have one such storm every one hundred years. Thus the term 100-year storm. Construction can normally occur here if the floor level of the building is above the flood level.

· The 100-year floodplain also contains an element called the floodway. This consists of the river or other watercourse and the adjacent land areas that must be reserved in order to discharge the 100-year storm. Normally no construction is allowed in the floodway except parking lots, sport fields, or other similar facilities that will not restrict the flow of water.

· An additional zone, called the 500-year storm, is a light flood hazard, but should be treated similar to the 100-year storm area.

This information must be accurately shown on a detailed site plan showing property limits, contours, building locations, vegetation, and other relevant features. Environmental issues are normally controlled at the state level of government (in Michigan it's the Department of Environmental Quality). This plan is prepared to their specifications and then submitted to them for review and approval. When they are satisfied with the plan they will issue the appropriate permit. A registered Architect or Professional Engineer should prepare these plans.

WILL I BE PROHIBITED FROM BUILDING IN MY WETLAND OR FLOODPLAIN AREAS?

The objective is not to prohibit all development in all floodplains and wetlands. The real purpose of the permit process is to determine if the development will increase the hazards of a flood (on either your property or others), and that it will not adversely affect the ecosystem. If you can demonstrate this to the satisfaction of the approval agency then you will likely be allowed to build your project.

Examples of projects that will likely be approved:
· A building or addition in the 100 or 500 year floodplain, but not in the floodway. The floor elevation should be approximately one foot above the level of flood.
· Parking lot, sport field, or open pavilion in the floodway, provided that it can be demonstrated that the water flow will not be affected in the case of a flood. Chain link fencing would not likely be approved since it will collect debris, which will restrict water flow.
· Building in a wetland area might be possible only if it can be demonstrated that the wetland area being used can be replaced. Otherwise, the only types of structures that might be allowed are small footbridges, benches, and other similar recreational features.

Gopher wood is not part of the specifications. Feet and inches will work as well as cubits. What is really needed is the commitment of Noah. We all want our building to be safe from the damages of floods, and we all want our environment safe. But, when the costs and timing of these concerns interrupt our mission of providing for our congregation these important issues can easily be trivialized. However, God does not trivialize. UCBN

ON THE BOARDS
Calvary Community Church - Flint, MI
Chelsea Free Methodist Church - Chelsea, MI
Community Church of God - Clio, MI
Genesee Road Church of God - Flint, MI
God's House of Prayer - Detroit, MI
New St. Mark Missionary Baptist Church - Detroit, MI
Our Savior Lutheran Church - Bad Axe, MI
Labor of Love Ministries - Pittsfield Twp, MI
Robinson Memorial Church of God in Christ - Lansing, MI
Spirit Life Christian Center - Howell, MI
Trinity Lutheran Church - Reese, MI
Warren Woods Church of the Nazarene - Warren, MI

TIMELINE - FROM DREAMS TO REALITY

You may wonder how long it will be from the time you sign a contract with an architect until you are actually using your new facility. There are many variables when making that determination. The size of the project is probably the greatest factor to consider. However, if determination of needs, space requirements, and available finances is completed before plans begin, the process will go much faster and be less costly.

A typical project will involve four phases.

SCHEMATIC DESIGN PHASE
Two months
Sketches will be reviewed with the owner. Then drawings of the final design, showing plans, exterior elevations, site plan, outline specifications, and cost estimates are presented at a formal meeting.

WORKING DRAWING PHASE
Four months
Complete working drawings include the following: detailed site plan, exterior elevations, foundation and structural framing plans, roof and ceiling plans, exterior elevations and details as required, plumbing, heating and electrical plans, material specifications, complete bidding requirements, and a refined cost estimate.

BIDDING OR NEGOTIATION PHASE
One month
The owner is assisted in selecting bidding contractors and issuing plans for bidding. The architect makes clarifications to plans, issue any addenda required, and receives and opens bids. He will work with the owner in analyzing the bids, and write the construction contract. CONSTRUCTION

ADMINISTRATION PHASE
Six - twelve months
The architect is responsible for the following: construction inspections, checking shop drawings, issuance of bulletins and change orders, approval of contractors' payment requests, collection of waivers of lien and sworn statements, issuance of substantial completion certification, punch list, and final inspection. Note: Getting preliminary approvals from Planning Commissions and Zoning Boards may cause delays in the time line. UCBN

ASK THE ARCHITECT

Q. What is a feasibility study? How can we benefit from one?

A. A feasibility study is designed to evaluate a building or proposed addition for function and/or cost. In other words, "Will it work?" Many times, pastors and laymen know what they need but they don't know if they can afford it or if it will work in their location. As architects we can evaluate the local demographics to see if would be wise to build in their location. We can advise you of related construction costs and architect's fees. Then we can show you how you can meet those needs through "phased construction."

Please contact us if you have a question you would like to see addressed in a future article, or need immediate answers.

WORLD WIDE WEB SITE

HULL-STEPHENS AND ASSOCIATES ARCHITECTS can now be found in Cyber-space! Yes, it's true, we are now floating around in the outer limits of the web world. For easy and fast information about the "in's and out's" of a building project check out our Resource Section. Prior issues of Church Building Notes are available. Many resources can be printed directly from the site or you may complete a request form and we will mail them to you. Also of interest to many is the list of projects we have done. These are listed by city. You can also view some CAD drawings in the CAD Section. UCBN

Past newsletters can be obtained as long as they last, by contacting Hull-Stephens and Associates Architects at: 810/635-4090 E-mail - info@hsaa.com